|GRANTWAY
EN

Moorabool Wind Farm Scholarships (Higher Education)

Federation University Australia

Share
Favorite
Feedback
Summary
14 August 2022
03 March 2023
03 March 2025
£5,000
2
Bachelor
Engineering and Technology
Individuals
Australia
Overview

The Project consists of 104 wind turbines located approximately 27km southeast of Ballarat. The project will produce up to 312 MW, approximately 1,050,000 MWh of electricity annually. This is enough renewable energy to power the equivalent of 228,000 average Victorian homes every year, representing approximately 10% of Victorian homes. The project is divided into two sections, North and South.

50 wind turbines are constructed in the Northern Section and 54 turbines are currently under construction in the Southern Section. A total of 104. All turbines proposed are 169m to the tip of the blade.

Construction began in July 2018 and the wind farm commenced partial operation in late 2020. Full operation is anticipated in 2022. The project is owned by Goldwind Australia.

Moorabool Wind Farm logoEstablished in 2009, Goldwind Australia offers comprehensive wind power solutions, including investment, construction, and operational and maintenance services. Goldwind Australia is a wholly owned subsidiary of Xinjiang Goldwind Science & Technology; a leading vertically integrated global wind power company offering comprehensive wind power solutions.

Eligibility
  • Bachelor of Engineering (excluding Mining)
  • Bachelor of Environmental and Conservation Science
  • Bachelor of Geoscience
  • Bachelor of Science
  • Master of Engineering Project Management
  • Master of Engineering Technology (excluding Mining)
  • Graduate Certificate in Community Energy and Micro Grid
Learn more or apply
All information about this funding has been collected from and belongs to the funding organization
25 April 2023