Development of innovative power take-off and control systems for wave energy devices
European Comission
ExpectedOutcome :
Project results are expected to contribute to all of the following expected outcomes:
- Demonstrated increased performance and reliability of wave energy devices.
- Improved knowledge on how to operate wave energy devices, their availability, maintainability and survivability.
- Reduction of LCOE.
- Reinforced industrial supply chain in Europe. Scope :
Power take-off (PTO) and control systems (including "prime mover" (waves to mechanical power) as well as the ancillary equipment like gearboxes, generators, and power electronics, power controllers, grid interfaces and other items) are key subsystems of wave energy converters. PTO and control systems can be improved to increase the efficiency of the whole converter, to increase reliability by controlling for instance the structuring health and power electronics, and to avoid extreme events that might compromise device survivability. Control systems dynamically adapt to and mitigate the forces of the continually changing ocean conditions. This can prevent damage during extreme events, contribute to increased performance and the viability of the technology. The manufacturing and testing of prototypes are relatively costly, and it is imperative that data from the demonstration are available to avoid repeating early engineering mistakes. Validation of the innovative concepts is expected to be done in realistic environments at small scale for longer periods or by onshore testing and controlled lab testing. If validation is done onshore the project should demonstrate that they can make use of existing test rigs or develop a test rig for the project, which can be used after the project by other developers. Development and demonstration of the PTO technology should be combined with control strategies as their requirements are inherently coupled. In the validation it is expected that key performance indicators are used based on international recognized metrics
In the development of the PTO system the ‘circularity by design’ principle should be used.
Specific Topic Conditions :
Activities are expected to achieve TRL 5 by the end of the project – see General Annex B.
General conditions
- Admissibility conditions: described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System
- Eligible countries: described in Annex B of the Work Programme General Annexes
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide .
- Other eligibility conditions: described in Annex B of the Work Programme General Annexes
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
Financial and operational capacity and exclusion: described in Annex C of the Work Programme General Annexes
Evaluation and award:
Award criteria, scoring and thresholds are described in Annex D of the Work Programme General Annexes
Submission and evaluation processes are described in Annex F of the Work Programme General Annexes and the Online Manual
Indicative timeline for evaluation and grant agreement: described in Annex F of the Work Programme General Annexes
- Legal and financial set-up of the grants: described in Annex G of the Work Programme General Annexes
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025). [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
Specific conditions
- Specific conditions: described in the [specific topic of the Work Programme]
Documents
Call documents:
Standard application form — call-specific application form is available in the Submission System
Standard application form (HE RIA, IA)
Template excel for the detailed budget costs breakdown (Lump Sum)
Presentation - Lump Sum Funding: What do I need to know?
Decision authorising Lump Sum under Horizon Europe
Standard evaluation form — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
MGA
Additional documents:
HE Main Work Programme 2023–2024 – 1. General Introduction
HE Main Work Programme 2023–2024 – 8. Climate, Energy and Mobility
HE Main Work Programme 2023–2024 – 13. General Annexes
HE Framework Programme and Rules for Participation Regulation 2021/695
HE Specific Programme Decision 2021/764
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual